PANATTONI
We comprehensively carried out installations as part of the expansion of the Panattoni Park Wrocław VII complex. Two modern logistics and warehouse halls were built at this stage. Both facilities have been certified under the BREEAM system at the Very Good level.
Bielany Wrocławskie
Area: 38 000 m2
Year of realization: 2022
logistics and warehouse facilities
- electrical installations: power connection via MV cable line, MV switchboards, main LV installation, branch LV installation, 20/0.4 kV transformer, LV bus bar, grounding installations, equipotential bonding connections, HV cable, basic, emergency and evacuation lighting, general sockets, equipment power supplies, cable routes, lightning protection installation, external lighting, electric car charging stations, telecommunications ducting, fire detection installation
- sanitary installations: rain water sewage installation with pipe retention, sanitary sewage installation, gas installations with radiant heaters, water supply with connections, roof drainage, sprinkler system, fire hydrant system
our offer is comprehensive, we provide technical and design advice at every stage of implementation
We carry out our work in accordance with the requirements of industry, national and international standards, as well as in accordance with the internal requirements and procedures of our clients. We provide a personalized approach to each investment and expert advice at all stages, from design to implementation to service.
Our staff is made up of experts with extensive experience and technical knowledge, who are fully committed to taking on new challenges. Inplag engineers provide professional and reliable service at every stage of the project.
project leaders
Krzysztof Mojsa
We make specialized investments on behalf of major market players.
References from previous investors are the best confirmation of our skills.
We make specialized investments on behalf of major market players. References from previous investors are the best confirmation of our skills.