CEFARM
The new distribution center in Święcice is part of CEFARM’s logistics infrastructure modernization. The facility has been designed for automated picking and sorting of pharmaceutical products. INPLAG was responsible for the installation scope of the project under a Design & Build model. The specific requirements of the pharmaceutical industry directly influenced the design and execution solutions. Ensuring power supply continuity, maintaining environmental parameters, safety, and system monitoring required careful design and coordination of the individual systems.
Święcice, the Mazowieckie Voivodeship
Area: 10,000 sq m
Year of completion: 2026
logistics and office building
- HVAC and Plumbing: domestic water plumbing, wastewater drainage system, domestic water and wastewater drainage system terminals, storm water drainage system, gas network, fire-fighting water tank, process heat and chilled water systems, roof drainage system, gas-fired boiler room, central heating system, mechanical ventilation with heat recovery, air-conditioning system, condensate drain system, gas installation, gas leak detection systems, ventilation for technical spaces with explosion hazard, integration of equipment with remote facility management system.
- Electrical Installations: MV and LV cable lines, transformer station, power generators, UPS, power supply, socket and lighting installations, DALI lighting control system, fire alarm system, CCTV, access control and time-and-attendance system, intrusion and burglary alarm system, structured cabling, BMS, License Plate Recognition system, man trap alarm system.
our offer is comprehensive, we provide technical and design advice at every stage of implementation
We carry out our work in accordance with the requirements of industry, national and international standards, as well as in accordance with the internal requirements and procedures of our clients. We provide a personalized approach to each investment and expert advice at all stages, from design to implementation to service.